At the end of Inner Belt Road in Somerville, TWDX Infrastructure is delivering a major interconnection facility between the Hub Express System and downtown Boston's fiber optic loop known as the Joint Trench Partners system, at Zayo's manhole 11A.
The project is a largescale telecom interconnection involving construction of 14,400 circuit feet (2.7 miles) of conduits and 2 manholes over 600 LF of trench.
Minutes of NSPB meeting held on September 3, 2024.
Specification for the proposed HEX tunnel vault C19BA-206 at location 61+28.
Notice of joint trench invitation for public utilities and telecommunications providers.
Project overview slide deck